A complete executive presentation system including premium PowerPoint templates, executive documentation and professional presentation resources.

SLIDES
32SLIDES
EDITABLE CHARTS
11EDITABLE CHARTS
VECTOR ICONS
13VECTOR ICONS
BUY NOW — £29.99

One-time payment. Includes all future updates to this kit.

Executive Presence Kit cover slide: a programme title, subtitle and board-review line on a dark ground.
Cover — programme title, subtitle and the meeting it is prepared for.

OVERVIEW

Why it exists.

Most executive packs fail in the same two ways. They look like they were assembled the night before, and they bury the decision on slide twenty-eight. This system fixes both.

Thirty-two slides carry a complete argument — position, direction, evidence, decision — in a dark, typographically precise design language. Every chart is a native PowerPoint object and every diagram is built from shapes, so adapting it to your numbers takes minutes rather than an evening.

FEATURES

Built to be edited, not admired.

NATIVE

Every chart is real

Bar, column, stacked, line, area, doughnut and radar — all native PowerPoint objects. Right-click, Edit Data, done. Nothing here is a screenshot pretending to be a chart.

EDITABLE

Diagrams you can drag

The swimlane plan, risk heatmap, dependency network, capability grid and stakeholder matrix are native shapes. Re-planning is a drag, not a rebuild.

VECTOR

Custom geometric icons

Thirteen marks drawn from primitives — no clipart, no stock photography, no cartoon glyphs. Recolour by changing a shape fill.

TYPESET

Fonts that travel

Cambria and Calibri throughout — both ship with Office on Windows and Mac. Send the file to anyone and nothing reflows or substitutes.

MOTION

Restraint, built in

A slow fade transition and a staged title build on every slide. Subtle enough for a board pack, removable in one pass if your house style forbids it.

GUIDED

Notes written for you

Every slide carries guidance in the notes pane — written for whoever is adapting the template, not for a presenter reading aloud.

WHO IT IS FOR

Written for the room you present in.

  • CIOs and IT Directors

    Board papers, quarterly reviews and investment cases that need to survive a hostile question without losing the room.

  • Service Delivery Managers

    Operational reporting that reads as control rather than activity — RAG, SLA, incidents and benefits in one pack.

  • Programme and Transformation Leads

    Roadmaps, dependency maps and decision papers for governance forums where the ask has to be unmistakable.

  • Consultants and Advisors

    A house style you can put a client's data into on a Tuesday and present on a Wednesday.

GALLERY

Executive dashboard slide with six status tiles, a delivery burn-up chart and this period’s movements.
Executive Dashboard — schedule, cost, scope, risk, resource and benefits at a glance.
KPI dashboard slide with six measures, each with a progress bar against its target.
KPI Dashboard — the six numbers the programme manages to, each against its target.
Transformation roadmap slide with four phases: Stabilise, Consolidate, Automate and Optimise.
Transformation Roadmap — four phases to steady state, each gate a decision point.
Risk slide listing the five risks that could stop the programme, with likelihood, impact and response.
Risks — the five that could stop the programme, with likelihood, impact and response.
Decision required slide with three options, one marked recommended, and the decision owner and deadline.
Decision Required — three options, one recommendation, a named owner and deadline.

WHAT’S INCLUDED

8 files, one download.

  • PPTX

    Executive Presence Deck

    The 32-slide system in 16:9, with native charts, editable diagrams and speaker notes throughout.

  • PDF

    Executive Guide

    Slide by slide: what each one does in the argument, the data it needs, and the way it typically fails.

  • PDF

    Executive Readiness Checklist

    The pre-presentation pass — number consistency, owners, dates and the eight-second recommendation test.

  • PDF

    Slide Breakdown

    A structural map of all 32 slides with the three tested cuts for eight, twenty and forty minutes.

  • TXT

    README

    Fonts, compatibility notes and the fastest route from download to first edit.

  • TXT

    LICENSE

    Plain-English terms covering internal, client and commercial use.

  • TXT

    Version Notes

    What changed, when, and what to re-download if you have an earlier copy.

  • PDF

    Commercial Use Licence

    The formal licence for use in client deliverables and paid engagements.

FAQ

Before you buy.

  • Eight files: the 32-slide PowerPoint system plus the Executive Guide, Readiness Checklist, Slide Breakdown, README, LICENSE, Version Notes and Commercial Use Licence.

REVIEWS

Newly released.

This product has just been published, so there are no customer reviews yet. We would rather show you an empty space than a testimonial we wrote ourselves.

Bought it? Tell us how it went — the first reviews will appear here.

Walk in with the room already listening.

Executive Presence Kit — a complete executive presentation system.

BUY NOW — £29.99

One-time payment. Includes all future updates to this kit.

GUIDES AND FREE RESOURCES

Digital Chrysalis © 2026

BUILD • TRANSFORM • EMERGE